How long should an AI-agent pilot take?
Time depends on access, integration work and the quality of source material. Define milestones and acceptance criteria first; a calendar deadline alone does not show whether the workflow is ready.
Tactus knowledge page
A useful AI-agent pilot tests one complete, reviewable workflow against the way your team works today. Start with a clear input, an agreed output, a process owner and a way to measure both quality and human effort.
Updated: · Published by: Tactus / Neatech
Practical implementation guidance. Examples are illustrative, not customer outcomes or a guarantee of feature availability.
Scope
“Help our finance team” is too broad for a first pilot. “Prepare the missing-document list for this month’s supplier invoice batch” identifies an input, an output and a reviewer. Choose repeated work where the team can explain what a good result looks like. Record the start and finish of the current process before designing the agent. Include waiting for missing data, checking the output and correcting mistakes. A pilot that produces a convincing answer but leaves the team to reconstruct the evidence has not completed the workflow.
Baseline
Build a small evaluation set from representative work you are allowed to use. Include routine requests, incomplete inputs, conflicting documents and a case the agent must decline or escalate. Keep some examples out of the setup phase so the final check is not simply a replay of rehearsed cases. Remove unnecessary personal or confidential data. Have the process owner write the expected result and acceptable variation before seeing the agent’s output. The test should expose whether the agent finds the correct evidence, not whether its writing sounds confident.
Acceptance
Compare useful outputs rather than counting completed chats. There is no universal pass percentage: a missed invoice exception and an awkward sentence have different consequences. Decide which errors stop the pilot and which can be corrected during review. Use an explicit acceptance record so stakeholders can see why the next stage is justified. The table is a proposed starting template; the thresholds belong to your process owner.
| Question | Evidence to collect | Decision owner |
|---|---|---|
| Is the output supported? | Source links and unresolved contradictions | Process specialist |
| Does it save total effort? | Preparation, review and correction time | Team lead |
| Are boundaries enforced? | Denied-access and approval test results | IT / system owner |
| Can the team recover? | Retry, stop and manual fallback test | Operations owner |
Run
First replay historical tasks without changing production records. Then run the agent alongside the existing process and compare the results. Only after that should a limited live workflow become the team’s normal path. Keep the sample, configuration and outcome traceable. If a model, instruction, connector or document collection changes, repeat the affected checks. NIST’s voluntary AI Risk Management Framework provides broader context for incorporating risk into evaluation; it is not a certification of this pilot or of Tactus.
Decision
At the end, decide whether to expand, revise or stop. A pilot may show that document preparation works but a particular integration needs more work. Preserve that distinction. Record who maintains the instructions, who handles failures and how much review remains. An agent with slightly slower execution can still be useful if it reliably prepares a complete work package; an apparently fast one can be costly if every answer requires investigation. Publish the actual measured result internally, including failed cases and exclusions, before using it in any business case.
Tactus
For a Tactus pilot, prepare the workflow brief, a permitted sample of source material and the output your reviewer needs. We can use these to scope agent instructions, document access and the integration work that your environment requires. Confirm available connectors, the model provider, the hosting arrangement and the approval behavior for the exact operations in scope. A proposed pilot sequence is not a fixed delivery-time promise. The useful next step is a bounded implementation brief that names dependencies, acceptance criteria and the person who can approve expansion.
Sources and further reading
Background for risk-aware evaluation; the pilot template on this page is Tactus’s own practical guidance.
FAQ
Time depends on access, integration work and the quality of source material. Define milestones and acceptance criteria first; a calendar deadline alone does not show whether the workflow is ready.
No. Start with the minimum approved sources needed for one complete output. A controlled file sample or read-only connection can be enough to evaluate the first workflow.
Measure output quality, evidence coverage, total human preparation and review time, corrections, failures and operating cost. Compare the same type of cases with the existing process.
Keep the failed cases and identify whether the problem is data, permissions, integration, model behavior or an unsuitable process. Revise the bounded scope or stop without expanding access.